国产成人综合自拍,日韩欧美黄色片,国产精品av久久久久久久久久,青青青久久,久久久久久久97,91免费精品,久久精品第一页

汾陽科士達(dá)精密代理商

品牌: 科士達(dá)
型號: 全型號
產(chǎn)地: 深圳
單價: 16458.00元/臺
發(fā)貨期限: 自買家付款之日起 天內(nèi)發(fā)貨
所在地: 山東 濟(jì)南
有效期至: 長期有效
發(fā)布時間: 2023-12-16 04:15
最后更新: 2023-12-16 04:15
瀏覽次數(shù): 180
采購咨詢:
請賣家聯(lián)系我
發(fā)布企業(yè)資料
詳細(xì)說明

1. Connect the input A, B, C phase fire lines, N lines and PE lines to the user terminals of single POD, mA, mB, mC, mN terminals and PE terminals respectively.
2. Connect the output A, B, C phase firing wires, N and PE wires to the user terminals of POD, oA, oB, oC, oN and PE terminals respectively.
3. Remove all the short copper bars on the input and output terminal rows of UPS. Connect the UPS terminal rows of single POD with the same silk-printed terminals on the input and output terminal rows of UPS, and connect the two PE terminals on the input and output terminal rows of UPS with the PE terminals of single POD.
Installation of UPS Power Supply Host in Costa
1. Verify that all input and output switches outside the Kosta UPS power supply are in the open position.
2. Connect battery cables.
Selective Battery Modules (2)
1. Take out the components of the UPS power supply of Costa, and insert the plugs marked as "Battery Module 1" and "Battery Module 2" into any battery interface on the back panel of the two battery modules.
2. The end of the battery cable marked as UPSPE is grounded close to the ground.
3. Connect one end of the battery cable labeled "BAT+", "BATN", "BAT-" to the "Bat+", "BatN", "Bat-" terminals of the input and output terminals of UPS respectively.
4. Tighten the fixed screw on both sides of the battery interface of the battery module with a screwdriver to prevent the battery cable from loosening or falling off.

相關(guān)科士達(dá)產(chǎn)品
相關(guān)科士達(dá)產(chǎn)品
相關(guān)產(chǎn)品
 
旬邑县| 怀安县| 那曲县| 高尔夫| 南华县| 遂平县| 方山县| 平武县| 且末县| 乌兰浩特市| 桐城市| 新田县| 马尔康县| 武安市| 旬阳县| 酉阳| 尖扎县| 平乡县| 新和县| 杨浦区| 乾安县| 锡林浩特市| 桑植县| 南靖县| 太谷县| 昆山市| 师宗县| 中西区| 咸宁市| 福安市| 灵台县| 濮阳县| 通化县| 伊川县| 荣成市| 彩票| 赤峰市| 临泽县| 宁南县| 旺苍县| 娄烦县|